Light Pair Blog Vol 9~ Schedule (Light Pair網誌第九回~ 進度表)

I had never talk about my schedule from the start of the blog. What I had completed now are:
我由開始寫網誌到現在從未提過我的進度表, 現階段完成有:

1. Comic booklet and DVD cover
2. Production blog (will keep on updating)
3. Comic rough drafts
4. Main characters design (hand drawn)
5. Mechanic design (hand drawn)
6. Main characters model sheet (Methane is not completed yet.)
7. World Map (rough)

The coming schedule is:
Beginning of November~ Mechanic modelling complete, background design and modelling complete (hopefully), storyboard complete
November to March~ animation complete (priority), comic booklet complete
April to May/June~Report and post-production

However, when the school starts, the coming assignments will make the schedule becoming very tight. I try my best to stick on the schedule. If I could not complete some parts, I would have to explain in my project report..

Next Volume: Light Pair Blog Vol 10~ Referred animation for planning storyboard
____________________________________________________________________________________
1.漫畫冊和DVD封面
2.製作網誌(會不斷更新)
3.漫畫草稿
4.主要人物設計(手繪)
5.機械設計(手繪)
6.主要人物決定稿(美迪没完成)
7.世界觀(草圖)

之後的進度表:
十一月頭~機械電腦圖完成,背景設計及電腦圖完成(希望)和分鏡表完成
十一月至三月~動畫完成(優先), 漫畫冊完成
四月至五月/六月~Project報告和音效
可是當學校開學時, 到時的功課會令這進度表更緊迫...我會盡力而為的。若有些部分不能如期完成, 我會在報告解釋

下回預告:Light Pair網誌第十回~ 計劃分鏡表的參考動畫